GARBAGE GRAB BUCKET OVERHEAD CRANE

AUTOMATIC GARBAGE GRAB CRANE FOR WASTE AND WASTE-TO-ENERGY PLANTS

The issue of overloading landfills is a significant problem for major cities today.

The daily waste generation in Vietnam is approximately 50,000 tons.

Urban areas account for about 35,000 tons per day, representing 70% of total waste, while the remaining waste comes from rural areas. In major cities like Hanoi and Ho Chi Minh City, the waste output ranges from 7,000 to 8,000 tons.

The predominant waste treatment method is landfilling, which accounts for 80% of the process, but it causes substantial pollution. It is important to note that the urbanization rate is about 30%, with over 1,000 urban areas nationwide.

The total annual waste output is 15 million tons, with 11.8 million tons of municipal waste generated annually.

Therefore, landfilling is no longer a sustainable solution in the current environmental conditions.

Vietnam has proactively collaborated with many countries such as Japan, South Korea, and European nations in adopting waste-to-energy technologies and methods for waste incineration to generate electricity.

Garbage Grab Crane Technology
Garbage Grab Crane Technology

In waste incineration technology, the waste handling process before entering the incinerator must ensure capacity, sorting, and continuity. Therefore, waste handling equipment such as the garbage grab crane plays a crucial role in this environment.

With the advancement of Industry 4.0, today’s automatic garbage grab cranes in waste-to-energy plants operate fully automatically, allowing the plants to function continuously without being affected by the environment, such as odors, toxic gases, and acids.

For waste-to-energy plants, special attention must be given to the following features when ordering automatic garbage grab cranes:

Sensor Technology:

  • The automatic garbage grab crane must be equipped with 3D sensors, position sensors, and travel sensors. Typically, these sensors are produced by countries like Germany, the US, and Japan.

Weight Control Technology:

  • The process of feeding waste into the incinerator must ensure the correct and sufficient quantity according to the requirements, with detailed reporting during operation. Therefore, the garbage grab crane must provide all necessary data reports to the control center.

Anti-Sway Technology:

  • Anti-sway mechanisms must be particularly emphasized when using garbage grab cranes to avoid load swinging.
Automatic Garbage Grab Bucket Overhead Crane
Automatic Garbage Grab Bucket Overhead Crane

Operating Mode and Speed in Waste-to-Energy Plants:

The garbage grab crane in waste-to-energy plants must meet the A8/M8 working class (the highest class for industrial cranes).

  • Lifting speed: 50~70 m/min

  • Hoist travel speed: 70 m/min

  • Crane travel speed: 70~100 m/min

3D Design - Garbage grabs Double girder overhead crane
3D Design – Garbage grabs Double girder overhead crane

Depending on the incineration capacity of the plant, the garbage grab bucket overhead crane must be capable of handling from 500 tons/day to 1,000 tons/day.

The hoist design must be open-type: motor, gearbox, and brake are separate to operate in high-intensity, dusty environments with continuous operation.

The electrical power system for the garbage grab crane must utilize high-quality cables from reputable countries.

The garbage grab bucket used in waste-to-energy plants is a hydraulic electric grab bucket. It opens and closes hydraulically and operates fully automatically from the control center.

Garbage grabs overhead crane
Garbage grabs overhead crane

=>> Additional Information: Grab Crane

The link between the grab bucket and the crane’s hoist must ensure anti-twist, especially measures to prevent rotation of the grab bucket.

Key Components for Garbage Grab Bucket Overhead Cranes:

  • Lifting motor: SIEMENS

  • Gearbox: Sumitomo, Bonfiglioli

  • Hydraulic brake: South Korea, France, Germany

  • Steel cables: South Korea, Japan, Thailand

  • Grab bucket: South Korea, Germany, Italy

  • Automatic control system: Beckhoff, Sick, Mitsubishi, Siemens

3D Design - Garbage grab bucket overhead crane
3D Design – Garbage grab bucket overhead crane

Operational Notes:

The garbage grab crane in waste-to-energy plants must always be ready. Therefore, every project must always have one operational crane and one backup crane.

Spare equipment must always be ready to replace faulty components, ensuring the garbage grab crane remains in working condition.

In response to these equipment requirements, VINALIFT has successfully provided numerous automatic garbage grab crane projects for waste-to-energy plants worldwide.

As an experienced manufacturer of garbage grab cranes, VINALIFT is undoubtedly the right choice for contractors worldwide looking for reliable equipment for waste-to-energy projects.

Installation of VINALIFT Automatic Garbage Grab Bucket Overhead Crane at the Thuận Thành Waste-to-Energy Plant - Bắc Ninh
Installation of VINALIFT Automatic Garbage Grab Bucket Overhead Crane at the Thuận Thành Waste-to-Energy Plant – Bắc Ninh
VINALIFT Automatic Garbage Grab Overhead Crane
VINALIFT Automatic Garbage Grab Overhead Crane
Automatic Garbage Grab Overhead Crane in operation
Automatic Garbage Grab Overhead Crane in operation
Waste-to-energy plants require continuous operation, hence having two cranes in the waste area is a must
Waste-to-energy plants require continuous operation, hence having two cranes in the waste area is a must
Smart waste sorting
Smart waste sorting
garbage grab bucket overhead crane
Garbage grab bucket overhead crane

 

Thank you for reading this article. Please follow us on our website or social media platforms such as FacebookLinkedIn, YouTube, and TikTok for new articles with useful information.