Guide to Selecting Overhead Cranes – Right Functionality – Right Budget

Cầu trục

Investing in Overhead Cranes for Workshops: A Guide to Selecting Overhead Crane – Right Functionality – Right Budget

In the manufacturing and construction industries, investing in an overhead crane is not just about choosing a lifting equipment – it’s a strategic decision that impacts productivity, safety, and operating costs for many years to come.

Choosing the wrong crane can lead to production disruptions, increased structural costs for the workshop, or even severe technical risks.

With over 18 years of experience executing hundreds of projects across industrial zones, seaports, warehouses, and chemical plants, VINALIFT’s technical team shares the core principles for selecting the right overhead crane type.

SEE MORE: WHAT IS AN OVERHEAD CRANE?


4 Application Scenarios – 4 Specific Solutions

1. Guide to Selecting Overhead Crane for Light Manufacturing Workshops – Narrow Spaces

Single Girder Crane exported to the Philippines
Single Girder Crane exported to the Philippines

→ Proposed Solution: Single Girder Overhead Crane

  • Suitable for woodworking workshops, light component manufacturing, equipment, and material handling in low-load workshops.
  • Low investment costs, compact structure, easy maintenance.
  • Common load capacities: 1 to 10 tons.

2. Logistics Warehouses, Outdoor Loading/Unloading – Large Span Required, Outdoor Operation

VINALIFT Gantry Crane at Viet-Italy Steel Plant
VINALIFT Gantry Crane at Viet-Italy Steel Plant

→ Proposed Solution: Single or Double Girder Gantry Crane

  • Independent of roof structure.
  • Flexible span from 10–35m.
  • Suitable for container depots, steel warehouses, timber packing yards, steel structures.

3. Heavy Industry Workshops – High Load Capacity, Continuous Operation

Double Girder Crane 70/30/5 tons at the turbine bay of Nhon Trach 3&4 Thermal Power Plant
Double Girder Crane 70/30/5 tons at the turbine bay of Nhon Trach 3&4 Thermal Power Plant

→ Proposed Solution: Double Girder Overhead Crane

  • Integrated with inverters, PLC control systems.
  • Designed according to FEM/DIN standards.
  • Load capacities from 10 to 450 tons.

4. Rotary Areas – Non-linear Loading/Unloading

Jib Crane System inside a workshop
Jib Crane System inside a workshop

→ Proposed Solution: Jib Crane

  • Ideal for packing stations, process cluster workshops.
  • Flexible operating radius from 3m to 8m.

5 Technical Factors That Must Be Considered

  1. Lifting Capacity:
    Ensure safe operation without overload.

  2. Span:
    Affects the length of the main girder and the workshop structure design.

  3. Lifting height:
    Determined by the size of the product and equipment below.

  4. Lifting & Traveling Speed:
    Based on operational requirements – can use single, dual, or variable speeds.

  5. Operating Environment:
    Solutions for dust protection, corrosion resistance, heat tolerance, etc., depending on the industry.

Need Crane Selection Advice? Send Us Your Workshop Layout – VINALIFT Will Respond Within 48 Hours!


Overview Comparison Chart (Suggested Visual Design)

Crane TypeLoad CapacitySpanSuitable EnvironmentInvestment Cost
Single Girder1–10 tons≤20mSmall workshops⭐⭐⭐
Double Girder10–450 tons10–35mHeavy industry⭐⭐⭐⭐
Gantry Crane5–100 tons10–35mOutdoor⭐⭐⭐⭐
Jib Crane0.5–5 tonsRadius 3–8mWorkshops, clusters⭐⭐

Case Study: 

VINALIFT IMPLEMENTS TWO 45+45 TON AND 15 TON GANTRY CRANES FOR THE HANOI METRO PROJECT

Double Girder Gantry Crane
Double Girder Gantry Crane

Technical Challenges & Operational Requirements

The first phase of the Hanoi Metro project required a double girder crane system capable of lifting and moving super-heavy pre-cast concrete blocks, large in length and requiring perfect parallel movement. Special requirements included:

  • High load capacity: 45+45 tons, synchronized double hooks.

  • Span (23+4)m, lifting height meeting outdoor construction standards.

  • Lifting capacity: 500 tons/h.

  • Absolute safety in restricted spaces near urban residential areas.

  • Extremely tight project timeline.


VINALIFT’s Synchronized Technical Solution

  • Special design for the synchronized dual hook drive system, using PLC and inverter control systems to ensure a balance force of ±1% during lifting.
  • High-precision machining of mechanical systems, ensuring stable operation in dusty, humid, and heavy load environments.
  • Short production and installation timeframe, with load testing at the factory before delivery.

Achieved Results

  • Safe and synchronized operation with no hook misalignment during use.
  • Met Hanoi Metro’s construction schedule, helping construction teams reduce assembly time by 15%.
  • Rated as the most reliable crane solution in the construction phase of 2023.

Feedback from Project Coordination Team

“Not many local units can ensure synchronized mechanical, electrical, and control design like VINALIFT. Their ability to meet custom requirements and execute quickly helped us stay on schedule.”


See More Details: 45+45 Ton Gantry Crane for Hanoi Metro – VINALIFT


Why You Need Technical Consultation from the Start?

“Initial design errors can result in hundreds of millions in additional costs due to structural adjustments, or even pose technical accident risks if the wrong crane is selected.”

VINALIFT is not just a supplier – we are your technical partner from design to implementation and long-term maintenance.


What You Need – VINALIFT Provides Consultation

Simply provide the layout of your workshop – VINALIFT’s engineering team will analyze and propose:

  • Suitable crane or gantry crane type.

  • Estimated investment costs.

Email: minhhieu@vinalift.vn
Website: https://vinalift.vn/
Hotline: 0393416686

Thank you for reading this article. Please follow us on our website or social media platforms such as FacebookLinkedIn, YouTube, and TikTok for new articles with useful information.