15 Ton Gantry Crane Renovation SAFETY – QUALITY

việt ý - vinalift

Gantry cranes are indispensable devices in factories and workshops, playing an important role in lifting and moving goods. However, after a long operation, the gantry crane will degrade, affecting performance and posing many risks. Therefore, gantry crane renovation must ensure continuous, stable, and safe production operations.

Why must the gantry crane be renovated?

  • Reduced working efficiency: Old, degraded gantry cranes often operate slowly, waste a lot of energy, and disrupt the production process.
  • Risk of occupational accidents: Parts of the gantry crane are worn and rusty, easily causing problems and fractures, endangering the operator and people around him.
  • Unable to meet new requirements: With the development of technology and increasing production needs, old gantry cranes find it difficult to meet the requirements of load, speed, and accuracy.
VINALIFT customers have also encountered such problems and they decided to maintain, repair, and renovate their equipment after many years of use.
Investor: VietNam Italy Steel Joint Stock Company – VIS
Job content: Maintenance, repair, and renovation of 02 sets of Gantry Cranes.
Renovate gantry crane - vinalift
Renovate gantry crane – vinalift

Procedures for maintenance, repair, and gantry crane renovation 

The process of renovating the gantry crane usually includes the following steps:
  1. Survey and evaluation: Inspect the entire gantry crane system to determine the damage and level of deterioration.
  2. Planning: Create a detailed renovation plan, including the scope of work, construction time, materials used and expected costs.
  3. Construction: Carry out renovation works according to the established plan.
  4. Acceptance: Recheck the entire system after renovation to ensure it meets technical and safety requirements.

Work category

Dismantle the gantry crane

Dismantling gantry crane at Hung Yen factory

Transport

Transporting the gantry crane from Party B’s factory in Hai Duong to Party A’s factory in Hung Yen for installation

Gantry Crane No. 1 (MINE HOOK CRANE) renovated the main beam from 35m to 32m

Erecting the gantry crane - vinalift
Erecting the gantry crane – vinalift
  • Reinforce and renovate the main beam of the bridge.
  • Welding, renovating rigid, ground beam
  • Replacing for new motor, gearbox of long travel
  • Make the motor base plate
  • Check, maintain, and replace the crane electrical cabinet system. Replacing all electrical systems on the gantry crane control equipment, control arm, electrical cabinets, driver’s seat… (equipment in the cabin) and checking the steering glass.
  • Restore the air conditioning system.
  • Renew the entire system railings, and working floors of the crane. Repairing structures, roofing for winches and cars, firing new roofing
  • Maintenance of the lifting trolley, and replacement of the steel cable.
  • Replacing new rails for lifting the trolley
  • Clearance, and paint all gantry crane

Renovations main beam from 35m to 32m and addition conxon 9.5m, 11m and operates at 15 tons load (MAGNETIC CRANE)

Double girder gantry crane vinalift
Double girder gantry crane vinalift
  • Welding, reinforcing, and renovating the main beam with a new aperture
  • Renovating rigid legs
  • Make a new rigid leg for the gantry crane on the side opposite the control cabin.
  • Make the wheel support the new rigid leg.
  • Make the motor base plate
  • Extend the main beam 8m on the opposite side of the cabin and rigid leg.
  • Maintenance of the traveling system of big winch 20(10+10)T, brake system, maintenance motor, the gearbox of the big winch, additional oil, and additional grease.
  • Check and maintain, replace new all electrical system on the gantry crane, extend the electric cable for the trolley
  • Check, and maintain the gantry crane air conditioning system.
  • Renew the entire system of, railings, and working floors of the crane. Repairing structures, roofing for winches and trolleys, firing new roofing
  • Maintenance of the control devices, control arms, electrical cabinets, and driver’s seat… (equipment in the cabin) check the steering glass
  • Maintenance of the trolley, and replacement of the steel cable.
  • Clearance, paint all gantry crane
  • New manufacturing of 04 sets of D500 moving blocks, new supply of 04 motors 5.5 kW engines due to expanding Conson 2 heads, not ensuring the pressure to replace.

Installation and inspection

  • Installation (Crane, workers, tools,…)
  • Inspection
  • Safety measures during construction

Advantages of gantry crane renovation

  • Improve working efficiency: After renovation, the gantry crane will operate stably and durably, improving labor productivity.
  • Ensuring safety: Minimizing the risk of labor accidents, protecting life and property.
  • Cost savings: Renovating a gantry crane often costs less than buying a new one, while also extending the life of the equipment.
  • Environmental protection: Minimize emissions, contributing to environmental protection.

New technologies applied in renovation

Currently, there are many new technologies applied in renovating gantry cranes such as:
  • Automation: Remotely control the gantry crane, monitor operations through the system, increase accuracy and minimize operator error.
  • Sensors: Monitor the operating status of components, and detect problems early.
  • Inverter: Smooth speed adjustment, energy saving.

Thank you for reading this article. Please follow us on our WEBSITE or social media platforms such as  FACEBOOK, LINKEDIN, and YOUTUBE for new articles with useful information.

 