Thermal Power Plant Project

New Haripur Power Plant Development project in Bangladesh < BAHA >

- EPC contractor: HUYNDAI E&C
- Quantity cranes and hoist: 16 set
- Turbine crane:
  • Capacity: 110/35 ton
  • Span: 19.2 m
  • Lifting speed main hook: 4.2 m/min
  • Lifting speed aux hook: 2 m/min
  • Traversing speed: 20 m/min
  • Travelling speed: 20 m/min
- Working duty: FEM 1Am
 
Assembly and packing photos
 

Microsoft Word - Document1

 

Microsoft Word - Document1

 

Microsoft Word - Document1

 
 
 

SUR INDEPENDENT POWER PROJECT in Oman

- EPC contractor: DAEWOO E&C
- Quantity cranes and hoist: 38 set
 
Assembly and packing photos

 

Microsoft Word - Document1

 

 

Microsoft Word - Document1

 

 

Microsoft Word - Document1

 

TRIPOLI WEST 4 x 350 MW Power Plant in Libya

- EPC contractor: HUYNDAI E&C
-  Quantity cranes and hoist: 25 set
-  Turbine crane:
·         Capacity: 65/30 ton
·         Span: 29 m
·         Lifting height: 19 m
·         Lifting speed main hook: 2.5 m/min
·         Lifting speed aux hook: 4 m/min
·         Traversing speed: 20m/min
·         Travelling speed: 25m/min
 
Assembly and packing photos 
 

Microsoft Word - Document1

Microsoft Word - Document1

Microsoft Word - Document1

 
 

Jeddah South Power Plant in Saudi Arabia

- EPC contractor: HUYNDAI HEAVY INSTRIAL CO,.LTD
- Quantity cranes and hoist: 273 set
- Turbine crane:
- Capacity: 135/27 ton
·         Span: 28.55 m
·         Lifting height: 35 m
·         Lifting speed main hook: 2.5 m/min
·         Lifting speed Aux hook: 5 m/min
·         Traversing speed 20m/min
·         Travelling speed: 25m/min
 
Assembly and packing photos
 

Microsoft Word - Document1

 

 

  • Introduction VINALIFT
  • +84 24 3641 9469 - ext: 102,103

    Mr Toan: +84 944 883 359

  • Technical Consult

    Mr Bay: +84 983 266 864

    Mr Diep: +84 904 856 856

  • Service

    Hotline: +84 24 3641 9469 - ext: 107

    Mr Tien: +84 912 288 077