BaHa Power Plant Project In Bangladesh
baha-2

BAHA power plant project in bangladesh opening new year 2012 for exportation cranes on the world of VINALIFT.

Read more
Portal Crane Project 25 Tons, ARM’S Reach 36M BaSon Shipbuilding – Company
Tin-tuc-ba-son-3

In the hot summer days, with the determination of employees VINALIFT Co. has designed, manufactured and installed successfully, right progress the 25-ton hydraulic portal crane arm’s reach 36 meters for Ba Son Trust- Company – MOD. Portal crane has been put into operation immediately after get licensed by Army testing centre on 07.05.2012.

Read more
Clean Room Crane Project – SamSung Company Vietnam
tin-tuc-sam-sung-1

June 10th, 2012, the Company Samsung electronic Vietnam has put into operation the clean room crane system to serve manufacturing telephone in Yen Phong Industrial Zone – Bac Ninh. The project requires the equipment to ensure there is free dust working environment (clean room level to 1000 and 10,000). On the basis of Samsung’s requirements, VINALIFT Company has researched, designed, produced to meet the stringent requirements of the equipment in a highly pure environment requiring.

Read more
Gantry Cranes 150/150 Tons – Song Thu Shipbuilding Factory – Ministry of Defense (MOD)
tin-tuc-song-thu-4

June 10th, 2012, the Company Samsung electronic Vietnam has put into operation the clean room crane system to serve manufacturing telephone in Yen Phong Industrial Zone – Bac Ninh. The project requires the equipment to ensure there is free dust working environment (clean room level to 1000 and 10,000). On the basis of Samsung’s requirements, VINALIFT Company has researched, designed, produced to meet the stringent requirements of the equipment in a highly pure environment requiring.

Read more
  • Introduction VINALIFT
  • +84 24 3641 9469 - ext: 102,103

    Mr Toan: +84 944 883 359

  • Technical Consult

    Mr Bay: +84 983 266 864

    Mr Diep: +84 904 856 856

  • Service

    Hotline: +84 24 3641 9469 - ext: 107

    Mr Tien: +84 912 288 077