- Year 2007: VINALIFT was established – March 2007:  Manufacture […]

- Year 2007: VINALIFT was established

- March 2007:  Manufacture and erection successful monorail 10 ton, lifting height 100m for VINAVICO.

- July 2007: Manufacture and erection successful gantry crane 100/100 ton for Song thu Shipyard company.

- November 2007: Manufacture and erection successful portal crane 15 ton x 50m for Pha Rung shipyard company.

- March 2008: Manufacture and erection successful overhead crane 100ton, 80 ton for Pha Rung shipyard company.

- May 2009: Manufacture and erection successful gantry crane 200 ton form Hoang Gia Shipbuilding.

 - June 2009: Manufacture and erection successful lifting ship floor for capacity ship 3000T (length 74m, width 20m) for Navy shipyard X46.

- November 2009: Manufacture and erection successful monorail 10 ton, lifting height 172m for VINAVICO.

- January, 2010: Manufacture and erection successful gantry crane 100/30 ton for 189 shipyard.

- March 2010: Manufacture and erection successful gantry crane (25+25) ton to open container steel scrap for Tusso steel mill.

- September, 2010: Manufacture and erection successful overhead crane (45 + 45) ton to prestressed concrete pipe in Hung long phuoc factory.

- July, 2011: Manufacture and erection successful overhead crane 35 ton for KONECRANE in NIPPON steel – Japan.

- June 2011: Manufacture and erection successful hydraulic portal crane 25 ton, arm reach 36m for Bason shipbuilding.

- July, 2011: Manufacture and erection successful gantry crane (30+30) ton for Sumitomo Mitsui Construction Co.,Ltd – High way line no. 3 in Ha noi project.

- August, 2011: Manufacture and erection successful gantry crane 150/150 ton for Song thu Shipyard.

- November, 2011: Manufacture and export successful turbine hall crane 110/35t and 60/25t for Thermal power plant BAHA in Bangladesh, EPC contractor: Hyundai Engineering and Construction company (HDEC).

- February, 2012: Manufacture and erection successful clean room crane system in SAMSUNG electronic viet nam – Mobile phone factory.

- Februay, 2012: Manufacture and export successful gantry crane 15 ton and 35 ton for OMAN Thermal power plant. EPC contactor: DAEWOO Engineering and Construction company (DAEWOO E&C).

- January, 2013: Manufacture and export successful jib crane, monorail for Maden Alumina refinery. EPC contractor:  Hyundai Engineering and Construction company (HDEC).

-  March, 2013: Manufacture and export successful Headblock for Mitsui Engineering Shipbuiding co .,ltd – Japan.

-  June, 2013: VINALIFT became to agency  to provide SUNGDO HOIST – KOREA in VIET NAM.

- July, 2013: Manufacture and export successful manholes and Bollard for Mitsui Engineering Shipbuiding co .,ltd – Japan.

- November, 2013: Manufacture and export successful turbine hall crane 135/27t,  30/7,5t. gantry crane  100/20t và 45t…for Jeddah south power plant – Saudi Arabia. EPC contractor Hyundai Heavy Industries Co., Ltd.

- January, 2014: VINALIFT became to agency of SWF hoist – Finland in Viet nam

- After a period of providing lifting equipment. VINALIFT noticed some industries requirement crane high speed, harsh working environment, heavy duty working, supper capacity, supper height, and replacement parts quickly what standard crane can’t meet. To meet the requirement of special cranes, VINALIFT perfected design standards “WINCH OPEN” and “WHEEL BLOCK” under brand “VINALIFT” applied to the crane, gantry crane lifting capacity ranging from (5 tons – 250 ton) have very competitive rates and begin to put into series production sold domestically and internationally.

  • Introduction VINALIFT
  • +84 24 3641 9469 - ext: 102,103

    Mr Toan: +84 944 883 359

  • Technical Consult

    Mr Bay: +84 983 266 864

    Mr Diep: +84 904 856 856

  • Service

    Hotline: +84 24 3641 9469 - ext: 107

    Mr Tien: +84 912 288 077